The Transition That Hasn’t Begun

Richard Dunmore
Aug 17
19 min read

WATER SECTOR REFORM · PR29

 


 

 

The Transition That Hasn’t Begun

Will PR29 become the first price review of the new water system, or another iteration of the old one?

1. The sector has a roadmap

The Independent Water Commission, chaired by Sir Jon Cunliffe, carried out the most comprehensive review of the sector since privatisation. Its final report, the Cunliffe Review, made 88 recommendations covering strategic direction, regional planning, legislation, regulatory institutions and methods, company governance, infrastructure, asset health and implementation.

The Review went beyond replacing regulators, tightening enforcement or adding another planning tier. It described an interconnected system in which government direction, regulation, investment, corporate governance and infrastructure management all had to change.

The first three articles in this series examined the problems the sector now faces. The first asked where authority should lie when ownership, control, accountability and risk no longer rest in the same hands. The second explored the distinction between running an essential company and controlling the conditions that determine its future. The third looked back over successive periods of water reform and argued that each round had solved the problem visible at the time, while helping to create the next one.

The Cunliffe Review engaged directly with those concerns. Government had failed to provide clear, coherent long-term objectives. Regulation had become fragmented, with too much weight placed on periodic processes and industry-wide models. Regulators knew too little about the condition of company assets. Economic, environmental and drinking-water regulation did not consistently pull in the same direction. Responsibility was dispersed even though customers experienced water as a single service.

The government responded in its January 2026 White Paper, A New Vision for Water. It accepted the case for replacing Ofwat with an integrated regulator for England, bringing together relevant functions from Ofwat, the Drinking Water Inspectorate, the Environment Agency and Natural England. Economic, environmental, drinking-water, infrastructure and financial performance could then be considered within one institution.

The approach also marked a change in principle. Dedicated supervisory teams would build a deeper understanding of each company, its assets, geography, finances, performance and risks. Better engineering capability and forward-looking measures of asset health were intended to reduce reliance on periodic submissions and standardised comparisons.

Five-year price reviews would remain, but within planning horizons extending over ten and 25 years. Companies would produce fewer plans and regional planning would be strengthened. Water resources, wastewater, environmental recovery, resilience and growth were to be treated as parts of the same problem rather than largely separate processes.

The White Paper supported an independent Water Ombudsman, gave greater prominence to financial resilience and infrastructure security, and recognised catchment and nature-based interventions alongside conventional construction.

There were, however, important parts of the Cunliffe Review that the White Paper addressed only partially, and some questions that it left open.

The Review proposed a statutory national water strategy and nine regional water authorities with significant responsibilities for planning, coordination, monitoring and delivery. The White Paper accepted the need for a stronger regional layer but stopped short of adopting that model. The eventual form, independence and powers of regional bodies remained undecided.

There was similar uncertainty around economic regulation. Company-specific supervision was endorsed, but the White Paper did not say how far supervisory judgement would displace the established methods of cost assessment and benchmarking. It remains possible that both will survive, with supervision added around the existing machinery while comparative modelling continues to drive the substance of decisions.

Company ownership and financial engineering would receive closer scrutiny, although the government endorsed no preferred ownership model. It recognised a fragmented, process-heavy legislative framework but deferred much of the simplification. Affordability was only partly resolved: stronger customer protection was supported, while broader proposals on social tariffs and consumer representation were not adopted in full.

The White Paper therefore supplied a direction of travel, not a finished operating model.

The promised Transition Plan was meant to explain the sequence, governance and leadership of reform, and the relationship between existing institutions and their successor.

Then came the King’s Speech in May 2026.

The proposed Clean Water Bill is intended to provide the statutory foundations. Its briefing notes described legislation to establish the integrated regulator and Water Ombudsman, strengthen supervision and early intervention, introduce resilience standards, improve asset mapping and reinforce drinking-water and public-health protection.

The Bill would also consolidate planning and support water efficiency, smart metering and reuse. Sustainable drainage and the prevention of pollution at source would gain a stronger footing. Infrastructure delivery, housing growth and security would form part of the legislation as well.

On paper, the sequence makes sense. The Cunliffe Review supplied the diagnosis and recommendations; the White Paper stated the government’s policy direction; and the Clean Water Bill would place much of the new system on a statutory footing.

The difficulty is that the Bill has not yet been published. We have a reasonably clear account of its intended scope, but not its detailed design.

The precise duties of the new regulator are unknown, as is the way conflicts between affordability, environmental recovery, resilience, growth, financeability and public health will be settled. Putting those duties under one roof will make the conflicts easier to see. It will not remove them.

The regulator’s governance is also unclear, including the balance between operational independence and government’s responsibility for strategic direction. Company-specific supervision may organise regulation, or sit alongside a price-review methodology still shaped mainly by comparative models.

Other practical questions remain unanswered. How will powers be divided between government, the integrated regulator and any future regional bodies? How will staff, information, duties and organisational cultures be combined? Which provisions will commence first, and how much of the eventual system will depend on secondary legislation or later guidance?

Most pressing of all is the unresolved relationship between the Bill and PR29.

Legislation takes time to pass, and building a regulator takes longer. Leaders have to be appointed; governance, systems and capability have to be created; and staff and functions must transfer without leaving a regulatory vacuum. PR29 cannot be put on hold until that work is complete.

Professor Dame Julia Black’s appointment as Senior Adviser on Water Reform Transition is significant. Even so, it does not create an independent transition structure able to own PR29 outcomes, direct the existing regulators and carry responsibility beyond 2030.

The sector has had its transformational moment on paper. What it has not yet seen is a transition of comparable substance.

The present period has something of the phoney war about it. Reform has been announced and the destination sketched out, but the institutions needed to deliver it have not been fully mobilised. Meanwhile, water must still be supplied, wastewater treated, statutory duties met and investment programmes delivered.

That continuity is essential. The danger is that it quietly becomes the design process for whatever follows.

2. PR29 is not waiting for institutional reform

PR29 will set the regulatory settlement that begins in 2030. Despite its name, it will not be designed in 2029.

Water-resource planning is already moving. WRMP29 will proceed during the reform transition under a framework that, by the government’s own account, will not yet embody all the longer-term changes proposed by the Cunliffe Review.

Drainage and Wastewater Management Plans, environmental requirements, long-term delivery strategies and work on asset health will also feed into the next settlement. Each process will help define what companies are expected to deliver and the evidence against which their proposals will be judged.

Ofwat has begun substantial work on asset condition and capital maintenance. It is collecting forward-looking information on priority assets, and early thinking has considered how that evidence might be used alongside established cost-assessment techniques.

None of this means that the PR29 methodology has already been decided. It plainly has not. Yet preparatory work is under way because, in practical terms, it has to be.

Choices are already being made about data; definitions, planning interfaces and assumptions about need, efficiency, resilience and deliverability are taking shape. These may look like technical preliminaries, but together they limit the choices available later.

A formal consultation will eventually give companies, customers and other interested parties an opportunity to challenge the methodology. Consultation matters, but it cannot stand in for political direction. It can test the proposed vehicle; it cannot decide retrospectively where the journey was meant to lead.

Without binding outcomes and independent transitional oversight, PR29 will develop through established institutions, processes and professional habits. By the time the new regulator exists, its freedom to change course may be narrower than the legislation implies.

Few early decisions will be irreversible on their own. Together, they create momentum. Planning processes align, data requirements drive company activity, work programmes acquire resources and regulatory expectations enter business plans. Changing direction becomes progressively harder.

Government is allowing PR29 to travel a considerable distance down a familiar road before putting in place the arrangements that could take it somewhere different.

The passage of the Clean Water Bill cannot be treated as the point at which transition starts. The Bill may provide the legal architecture, but strategic and institutional direction is required while that architecture is still being drawn.

3. Legal authority is not the same as future legitimacy

Mark Thurston, chief executive of Anglian Water, described the present position neatly: “Ofwat is still the regulator until it isn’t.”

That is legally correct. Ofwat remains the economic regulator until Parliament provides otherwise. The Environment Agency continues to regulate the water environment, the Drinking Water Inspectorate remains responsible for drinking-water quality, and Natural England and the other relevant bodies retain their existing functions.

A regulatory vacuum would be unacceptable. Companies need decisions, enforcement must continue and PR24 has to be delivered. Permits, drinking-water standards, investment programmes and customer protections cannot be suspended while the institutional settlement is redesigned.

Much of the expertise on which the new regulator will depend also resides within the existing bodies. Reform must draw on that knowledge rather than pretend it can start again with a blank sheet.

The harder question is whether legal authority to run today’s system also provides sufficient political legitimacy to design tomorrow’s.

The Cunliffe Review, the White Paper and the proposed Clean Water Bill all proceed from the conclusion that the current regulatory arrangements have not produced the results expected of them. Fragmented responsibility, poor situational understanding and established regulatory methods are among the problems the reforms are intended to address.

That leaves existing regulators in an awkward position. They must discharge their statutory duties and contribute knowledge and experience to the new system, while their functions, methods and cultures are themselves reconsidered.

Should those same institutions retain substantial discretion over the assumptions, outcomes and organising principles of PR29? My answer is no.

Administering the current framework and determining its successor’s destination are different responsibilities. The first remains with statutory regulators until their functions transfer. The second needs authority independent of the organisations being reorganised.

Ofwat dominates this debate because it runs price reviews, but the question applies equally to the Environment Agency and Drinking Water Inspectorate. Both will shape the duties, evidence and standards feeding into PR29. Their expertise is indispensable, but both belong to the institutional structure being integrated or replaced.

Their participation is necessary. Exclusive ownership of the future is not.

4. Government is missing the transition window

Only government can settle this. Ministers determine strategic direction, Parliament creates the regulator, and government must specify national outcomes, establish transitional governance and align the legislative and price-review timetables.

The White Paper promised a Transition Plan during 2026, an interim Strategic Policy Statement for Ofwat, ministerial direction to the Environment Agency and early leadership appointments for the new regulator. Long-term guidance was expected in time to influence PR29. The King’s Speech then added the Clean Water Bill to the current parliamentary programme.

There has been visible progress. Julia Black’s appointment provides senior advice and oversight, and design work is under way. The sector still lacks a constituted transition authority able to own PR29 outcomes, impose binding guardrails and carry responsibility into the new regime.

The promised Transition Plan has yet to give the sector a complete roadmap. Nor have the government’s priorities been translated into outcomes sufficiently clear to guide the next price review.

Ministers may still be within the timetable they published. In practice, however, the timetable for PR29 has begun to overtake them.

July’s change of government increases the risk. A new administration may legitimately reconsider public control, ownership, investment and accountability. Another prolonged period of diagnosis would be harder to justify.

The Independent Water Commission has reported. The White Paper is available, the intended scope of the legislation has been outlined, and the sector’s weaknesses have been examined at length. The missing ingredient is mobilisation.

Will the new government confirm and accelerate the Clean Water Bill? When will the Transition Plan appear? Who will own the outcomes of PR29? What instructions will be given to the present regulators? How will the future regulator assume responsibility for a review that is already being built?

Those questions cannot wait for every structural detail. Independent transition leadership is the immediate priority, followed by binding outcomes. Existing regulators then need explicit instructions for the transition, and the timetables for legislation, commencement and PR29 must be aligned.

A Bill enacted after the review’s direction has already hardened may solve the legal problem and still miss the regulatory one.

5. Individual company crises risk becoming sideshows

Thames Water cannot be ignored. Its finances, creditor negotiations, operational performance and possible future ownership matter to millions of customers and to the credibility of the regulatory settlement more widely.

South East Water’s supply interruptions and subsequent scrutiny raise serious questions of resilience, customer service and accountability. Both companies demand attention, but can draw it away from the institutional work on which lasting reform depends.

Company crises are more visible than institutional transition. They produce hearings, headlines, investigations and political intervention. Transition consists of governance, sequencing, appointments, draft legislation and the gradual formation of a price-review framework. Inevitably, the immediate event wins attention.

Thames may nevertheless be the largest problem that the sector can currently see without being the most consequential problem the government has to solve.

Resolving Thames Water’s finances will not establish the strategic direction for England’s water system. Enforcement against South East Water will not create an integrated regulator. Scrutiny of an individual management team will not decide who owns the outcomes of PR29. These cases add to the evidence of weaknesses that have already been diagnosed; neither amounts to reform.

Visible regulatory action can give a misleading impression of momentum. Investigations open, executives face committees, penalties are debated and official statements harden. Much of this is necessary, but it reveals little about the transition.

Debate over the Clean Water Bill could likewise narrow into familiar arguments about punishment, pollution and the abolition of Ofwat. Those issues will attract attention because they are politically tangible. The more important question is whether the legislation, transition arrangements and PR29 will create a system capable of recognising risk and directing action before customers experience failure.

The new regulator will need powers of intervention. Just as importantly, it will need the authority, information and company knowledge to use those powers intelligently.

6. The case for independent transition leadership

There is no credible Plan B for PR29. Companies need a 2030 settlement, customers need clarity about bills and service, and investors need to understand the framework for their capital. Environmental programmes, resource plans and infrastructure projects cannot drift indefinitely.

Pausing the review until the Clean Water Bill has passed and the new regulator is fully operational would exchange the current difficulty for a more immediate one. Independent transition leadership offers a workable alternative.

It need not become another large regulatory institution, nor should it attempt to administer every part of PR29. Its job would be to own the outcomes.

Government would set the national direction and a transition body would convert it into binding principles for the review. Ofwat, the Environment Agency, the Drinking Water Inspectorate and others would continue the work for which they remain legally responsible.

An independent body could test whether the developing settlement reflected the announced reform. Is company evidence influencing decisions? Are resilience and long-term asset needs treated differently? Is reliance on standardised modelling declining? Can the programme be financed and delivered? Do the settlements fit the system envisaged by the Clean Water Bill?

Continuity after 2030 matters. Those responsible for PR29 outcomes should form part of the leadership that later supervises and enforces them. Otherwise the successor may inherit a settlement it did not design and expectations it did not set.

The practical division is straightforward. Existing regulators may have to administer PR29, but they should not enjoy sole discretion over its destination. Their expertise would remain central to the process, within a different and more legitimate chain of authority.

Without that change, existing regulators will operate the current system, help design its replacement, determine the next settlement and transfer it to a successor. That places remarkable faith in institutional self-reinvention.

Resistance to reform seldom takes the form of a formal refusal. More commonly, it arrives as continuity. The language changes, established processes acquire new labels, supervisory teams are added and more engineering evidence is collected, while familiar methods of decision-making retain their place at the centre.

No one has to oppose reform openly for its effect to be diluted.

7. Government must set the destination within six to twelve months

Transition leadership cannot make political choices for ministers. Within six to twelve months, government must define the outcomes it expects from England’s water system.

Safe and secure supplies will clearly be one of them. Environmental recovery, resilience, housing and economic growth, customer service, affordability and financial stability will stand alongside it. Each objective is reasonable; fitting all of them into the same timetable and funding envelope is not.

Greater resilience requires investment and often higher operating costs. Faster environmental improvement affects bills, capital requirements and supply-chain capacity. Growth adds pressure to water resources and wastewater treatment, while affordability limits the pace of delivery.

An integrated regulator will bring those tensions into one institution, but cannot wish them away. Government therefore needs to offer more than a catalogue of desirable outcomes. It must explain how difficult choices are to be approached and who will be accountable for making them.

Otherwise political trade-offs will continue indirectly through models, penalty regimes, permitting decisions and the treatment of company plans. Ministers can then criticise the result while insisting the decision belonged to the regulator.

Regional and catchment priorities add a further dimension. Water resources, wastewater, housing, agriculture, industry, flood risk and nature interact in real places. Their boundaries do not correspond neatly with those of water companies, regulators or government departments.

The regional institutions envisaged by the Cunliffe Review will not be fully functioning in time for PR29. That is not a reason to postpone the work until an ideal architecture exists. Current plans, regional groups and catchment evidence can provide a practical interim basis for translating national priorities into clearer expectations for places and systems.

Within that framework, companies can take responsibility for developing their long-term plans. Government sets the outcomes; regional evidence gives those outcomes context; companies produce deliverable programmes; regulators test the evidence and supervise delivery.

At present those pieces do not form a coherent chain. The Clean Water Bill offers a future statutory framework. The Transition Plan should describe the route towards it. Strategic direction should define the outcomes, and PR29 should convert them into settlements suited to individual companies.

No single document can perform all four tasks.

8. What a different PR29 should look like

PR29 will retain features of the current system. Existing planning processes cannot simply be discarded, comparative evidence remains useful, and companies must face rigorous challenge on cost, performance and efficiency. The new regulator will not begin with perfect information or mature supervisory capability.

Even with those constraints, the review should be recognisably different in substance.

Binding government outcomes ought to be visible in each settlement. If the process starts with a theoretically efficient company and adjusts for reality afterwards, the old hierarchy survives. It should begin with what the country, region and catchment need, then use each company’s circumstances to inform the programme and timetable.

Financeability and deliverability also deserve more serious treatment. A modelled allowance is not the same thing as an executable programme.

Can the company finance what is required? Does it possess the management and technical capacity? Is the supply chain able to deliver? Have projects been sequenced sensibly? How much of PR24 will remain under construction when the next period starts, and what headroom exists for delay, disruption or increases in cost?

These questions cannot be left until after an efficient allowance has been calculated. They help determine whether the settlement has any real prospect of success.

Supervision must become more than a response to failure. Dedicated teams should continuously understand each business: its assets, leadership, finances, operational risks and ability to deliver. The proposed Performance Improvement Regime may enable earlier intervention, but active supervision should not be confined to troubled companies.

Knowledge of the company should become the foundation of regulation.

Longer time horizons are necessary too. Reservoirs, transfers, treatment works, network renewal and substantial catchment-recovery programmes extend beyond a single five-year period. The same is true of cultural change, demand reduction and the rebuilding of organisational capability.

PR29 should present the 2030–35 programme as one phase of a longer journey. Companies and regulators should explain what subsequent phases are intended to achieve, the assumptions on which they depend, and the way progress will be tested between formal reviews.

Engineering evidence will be central to this approach, but an engineering-led regulator must not become one concerned only with physical construction. Reservoirs, treatment capacity, transfers and network renewal remain essential. So do efficiency, reuse, sustainable drainage, catchment management and nature-based solutions.

Some of these interventions cross institutional and company boundaries. Others remove or postpone the need for concrete infrastructure. Established regulatory categories have often struggled to deal with them. The Clean Water Bill recognises many of these approaches; PR29 will reveal whether they are regarded as credible options when funding is decided, or remain attractive language at the margins.

9. Moving beyond econometric doctrine

Econometric benchmarking began as a regulatory tool. Over time, it has come to resemble a doctrine.

Its appeal is understandable. Monopoly companies must be challenged, and regulators cannot accept every spending proposal at face value. Comparative analysis appears objective and provides a repeatable means of protecting customers from inefficient expenditure.

Water companies, though, are not interchangeable production units. Their networks were constructed in different periods. Geography, hydrology and topography vary, as do treatment requirements. Population growth, environmental obligations and historic investment leave companies with very different starting points. Even apparently comparable data may have been assembled from different systems, definitions and levels of asset knowledge.

Models can expose useful questions. They should not be permitted to supply the answer by default.

This goes beyond applying a sound technique too rigidly. Industry-wide benchmarking is ill-suited to its present weight in a sector with widely varying circumstances. Apparent precision substitutes for understanding an individual company.

Adding a company-specific adjustment at the end of a model-led process does not resolve the problem. The hierarchy remains the same, with judgement permitted only after the model has established the terms of the decision.

The Cunliffe Review called for supervisory judgement based on sustained engagement with companies. The White Paper and the proposed Clean Water Bill adopted the language of company-specific supervision. PR29 will show whether that language reflects a genuine shift in hierarchy: will models inform judgement, or will judgement still be bounded by models?

The alternative is not instinctive decision-making behind closed doors, and it does not allow companies to set their own allowances. There is a more disciplined route.

Government would establish binding outcomes. Companies would prepare long-term plans showing how they proposed to meet them. Independent engineering and operational evidence would test asset condition, risk, options and deliverability. Supervisory teams would build continuing knowledge of each business and challenge its assumptions. Regulators would exercise judgement transparently and explain the decisions reached.

That process is more demanding than reliance on a model. A company can argue about coefficients, comparators and datasets. It is much harder to conceal poor asset knowledge, weak leadership or an undeliverable plan from a supervisory team that understands the business in depth.

Comparative evidence should remain available as a diagnostic challenge. It should cease to be the organising doctrine of the settlement.

10. The warning signs the sector should watch

The outcome is not predetermined. Government still has time to establish credible transition leadership, the Clean Water Bill can provide a strong statutory basis, and PR29 can become the first practical expression of a post-Cunliffe system.

Several risks are nevertheless close enough to warrant attention now.

The first comes from incumbency. Existing regulators hold the statutory powers, information, staff and processes needed for the early work. Their influence over the transition is understandable and, to some extent, unavoidable. Influence can nevertheless slide into ownership.

If the Clean Water Bill establishes the new regulator only after PR29’s central choices have been settled, that regulator will inherit a settlement designed elsewhere.

Path dependency is the second risk. Decisions on data, models, planning interfaces and evidential standards may appear technical and capable of revision. In combination they reduce the options still available. By the time formal consultation opens, companies may already have reshaped plans and programmes around the assumptions they expect the regulator to use.

There is also a question of legitimacy. A process may be lawful, competently run and extensively consulted upon while lacking the political authority expected of the first price review following an ostensibly transformational reform. That gap will grow if the present regulators retain wide methodological discretion and transition leadership remains advisory.

The least visible danger is a failed transition disguised as a successful reorganisation. Government could accept the language of the Cunliffe Review, pass the Clean Water Bill and create a new institutional structure without altering the way consequential decisions are made.

The warning is unlikely to come in a single dramatic announcement. It will appear in further delays to the Transition Plan, in strategic objectives that remain broad while detailed work on PR29 proceeds, or in legislation that leaves too much to secondary powers. The early leaders of the new regulator may be appointed without authority over the review. Supervisory teams may be created while comparative models continue to dominate decisions.

In that version of reform, the new regulator would inherit PR29 rather than shape it.

Industry leaders, advisers and commentators should raise these concerns before publication of the draft methodology. Doing so is not opposition to reform. Waiting until the choices have solidified would make the intervention largely academic.

11. The minimum test for PR29

Not every Cunliffe recommendation can be operational by 2029. Regional planning will still be maturing, asset information will remain incomplete and catchment regulation will take time. The new regulator may still be building capability as the review concludes.

Perfection is the wrong test. Three minimum expectations are more useful.

First, government outcomes must be translated into company-specific settlements. Broad ambitions in a White Paper or the Clean Water Bill will not suffice. Customers, companies and investors should be able to trace the effect of national priorities on decisions made for each business. Vague objectives would merely leave regulators to make political trade-offs implicitly.

Second, supervisory judgement must carry real weight. Comparative analysis can continue, but company plans, engineering evidence, asset condition and deliverability should determine the substance of the settlement. A review still dominated by econometric comparisons and retrospective efficiency tests would plainly belong to the old system.

Third, there must be a credible route beyond 2030. PR29 cannot finish the transformation, but it should show how planning, supervision, catchment integration and regulatory capability will develop during the period it governs. Responsibility for that work must be explicit.

A newly named regulator staffed by many of the same people would not in itself represent failure. Their knowledge and experience will be essential. Failure would be a newly named regulator displaying the same habits, using the same methods and operating without clearer direction from government.

12. The window is closing

PR29 has to proceed. There is no alternative settlement waiting in reserve, which makes the transition arrangements more important rather than less.

Government cannot wait until the Clean Water Bill has passed before giving the review its strategic direction. Legislation cannot retrospectively correct every choice made during its passage, and consultation later in the process cannot compensate for political decisions left unresolved at the outset.

The institutions being reformed should not carry sole responsibility for defining the outcomes of the system that will replace them.

The available window is narrowing. Without independent transition leadership, binding government outcomes and clear instructions to the existing regulators, PR29 will continue along the route most familiar to the present system.

This is not an argument about the intentions or competence of individuals. Institutions preserve themselves through habits, procedures and assumptions. They generally absorb new language more readily than they alter the way power is exercised and decisions are made.

The Cunliffe Review was presented as a transformational moment. The White Paper accepted much of its diagnosis and direction, and the Clean Water Bill may provide the statutory architecture. Architecture alone does not carry an organisation from one system to another.

The reform programme is unlikely to fail through open political opposition. The greater risk is institutional inertia: the capacity of the present system to adopt the vocabulary of change while retaining the methods and distribution of authority that the reforms were meant to challenge.

In time, a new regulator will appear on the organisational chart. That will tell us very little by itself.

The test is whether PR29 translates government outcomes into company-specific settlements, places informed supervisory judgement at the centre of decisions, and establishes a credible route into the post-2030 system.

It need not achieve everything at once, but the change must be unmistakable. Otherwise the diagnosis offered by the Cunliffe Review and the promise embodied in the Clean Water Bill will end in another version of the old settlement.

That opportunity will probably not be lost through one conspicuous decision. More likely, it will be surrendered through a succession of reasonable-looking defaults, leaving the system we already know in place for another five years.

 
 
 